The government wants to remove the existing chiller in the basement of Building 500 at Offutt Air Force Base, Nebraska, and install a fully operational replacement with piping, controls, and related work. Bids must be submitted electronically by email, and the revised deadline is September 16, 2026, at 11:00 AM CST. A site visit is scheduled for August 20, 2026, and questions are due by August 27, 2026.
About this opportunity
Project Title: Replace Chiller 2, B500 Description: This requirement consists of removing the existing chiller located in the basement level of B500 and installing a brand-new, fully operational replacement unit, including all associated connection piping, controls, and incidental work IAW attached Drawings and Specifications. Project Location: Offutt AFB, NE **ELECTRONIC BID SUBMISSIONS ONLY. SUBMIT VIA EMAIL AS DETAILED IN ATTACHMENT 01 - BID SUBMISSION AND OPENING INFORMATION. FAX AND HARDCOPY BIDS WILL BE REJECTED**
1. SITE VISIT: 20 August 2026, 9:00 AM CST at bldg 500, Offutt AFB, NE. Interested offerors that currently don't have base access must submit the completed Attachment 02 - 55…
Time remaining
Closes Sep 16, 2026
Related Opportunities

FY 2026 Preventive Maintenance Services to the Building Automation System

B40 Heat pump Replacement

Backflow Preventer Upgrades

556-26-2-6953-0001 - 556-24-108 Double Block and Bleed Construction (VA-26-00035322)

556-26-2-6953-0001 - 556-24-108 Double Block and Bleed Construction (VA-26-00035322)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-6F014C