Opportunity timeline
In plain English
NOAA wants a contractor to repair or replace five HVAC heat-pump systems at its Galveston facility. The work includes three ductless systems at the Turtle Hospital, a 3-ton duct-connected split system in the Wet Lab Observers Area, and a 2-ton dual-head ductless system in the Turtle Barn Aquaculture Area. The base year also includes quarterly preventive maintenance, and all equipment must have coastal corrosion protection.
About this opportunity
The purpose of this amendment 0001 is to clarify CAR 1352.246-70, as well as provide an updated revised SOW and respond to the questions received for Solicitation No. 1333MF26Q0110. Combined Synopsis Solicitation: 1333MF26Q0110 CAR 1352.246-70 final inspection and acceptance will occur at the NOAA Galveston facility An updated Revised Statement of Work is included in this amendment 0001 as an attachment to the amended solicitation. Revisions are clearly identified in “red font”. Response to Questions: Q&A #1 Solicitation_1333MF26Q0110_FD-26-517 (Galveston HVAC repairs/Replacements) All questions were due from vendors by 10am EST 9/10 Q1-Please confirm the required nominal capacity for the…
Time remaining
Closes Sep 16, 2026
Related Opportunities

FY 2026 Preventive Maintenance Services to the Building Automation System

B40 Heat pump Replacement

Backflow Preventer Upgrades

556-26-2-6953-0001 - 556-24-108 Double Block and Bleed Construction (VA-26-00035322)

556-26-2-6953-0001 - 556-24-108 Double Block and Bleed Construction (VA-26-00035322)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-E132A6

