Opportunity timeline

PostedSep 11, 2026
DeadlineSep 29, 2026

In plain English

Fort Bend County Municipal Utility District No. 143 wants improvements at Lift Stations 1 and 2. Work includes replacing pumps, control panels, valves, piping, a diesel generator, and wet-well coatings at Lift Station 1, plus piping, control-panel, electrical, and site improvements at Lift Station 2. Plans, addenda, and bidding are managed through CivCast.

About this opportunity

The improvements at Lift Station No. 1 include but are not limited to blasting and recoating piping and fittings, removal and replacement of all riser piping, removal of t-lock liner, one inch (1") thick concrete mortar repair on the interior of the wet well walls, blasting and recoating of wet well with 100% solids epoxy coating, removal and replacement of wet well vent, removal and replacement of three (3) submersible pumps and lift station control panel, removal and replacement of the existing three (3) swing check valves with air-cushioned check valves, relocation of the vent pipe, installation of a permanent bypass connection on the header piping, removal and replacement of the diesel…

Time remaining

Closes Sep 29, 2026

15Days
:
05Hours
:
31Min
:
22Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-AC392E