Opportunity timeline
In plain English
The City of Sylvania wants a contractor to resurface about 3.42 miles of city streets in Sylvania, Georgia, including milling, patching, asphalt overlay, and striping. Work must be completed within 90 calendar days. Bids are due October 1, 2026, at 2 p.m. at Sylvania City Hall, with a bid bond or cashier’s check for at least 10% of the base bid; contractors must comply with E-Verify.
About this opportunity
Sealed bids for construction of 2026 Sylvania Street Improvements will be received until October 1st, 2026, 2 PM at the City of Sylvania City Hall at 104 South Main Street, Sylvania, GA 30467 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of thirty (30) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Resurfacing approximately 3.42 miles of City streets with asphalt. The contractor shall also provide milling, bituminous tack coat,…
Time remaining
Closes Oct 1, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-811F96

