Opportunity timeline

PostedSep 10, 2026
DeadlineNov 9, 2026

In plain English

The Navy wants a contractor to repair or modify MOUNT, RESILIENT, WEA units, reference number 67DP-14795-01. Vendors must provide an estimated full-repair price, teardown and evaluation rate, turnaround time, capacity limits, and the estimated cost of a new unit; the requested repair turnaround time is 180 days. The amendment extends the deadline until November 9, 2026, and non-OEM vendors must identify the OEM and provide authorization.

About this opportunity

3. REQUIREMENTS

3.1 Cage Code/Reference Number Items - The MOUNT,RESILIENT,WEA repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE____Ref. No. ;06742 67DP-14795-01;

Time remaining

Closes Nov 9, 2026

56Days
:
13Hours
:
30Min
:
58Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-2165B9