Opportunity timeline
In plain English
The Navy wants a contractor to repair, upgrade, overhaul, test, and inspect NRP Control Panel A, part number 284A2939-5 and NSN 7RH 1680 016185504 P8, returning it to ready-for-issue condition. The contractor must provide the facility, labor, materials, parts, tooling, and testing equipment. Government acceptance is required within 125 days after receiving each asset, and assets must be inducted within 365 days after award.
About this opportunity
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and…
Time remaining
Closes Oct 13, 2026
Related Opportunities

VALVE,LINEAR,DIRECT_End_Item_T-38_NSN_4810008648673HS_PN_3-43905-1

Lower Attachment AS

Resistor, VA, NONWI

SPRRA1-26-R-A013

MH-65 Backing Brake Plate
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-228E9F

