Opportunity timeline
In plain English
USIBWC wants a contractor to design and build a buoy and warning system at Retamal Dam. The work includes anchors, alert equipment, warning signs, site preparation, inspections, debris disposal, and quality-control testing. Work is limited to 7:00 a.m.–3:30 p.m., Monday through Friday, and workers must meet site-access and identification requirements. Proposals are due September 16, 2026; a site visit and completed Form 358 are required before attending.
About this opportunity
***Proposal due date extended to 9/16/2026*** The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the complete the Design-Build of Retamal Dam Buoy System. Upon conclusion of the project, the new waterway barrier line will prevent public access to dangerous hydraulics upstream/downstream of the dam, the warning system and signage will alert the public of the danger ahead providing a waterway barrier line to include anchors, alert system, and warning signs at the Retamal Dam. The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste,…
Time remaining
Closes Sep 19, 2026
Related Opportunities

Lake Pontchartrain Tributaries, Tchefuncte River Bar Channel, Maintenance Dredging, St. Tammany Parish, Louisiana ED 26-009

CMC Greenspace

Ak-yukon Delta NWR-MX Entry Pilings

GUSG Habitat Hydro-logic Restoration 202

Conant Bank Stabilization
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-25047A

