Opportunity timeline
In plain English
Seekonk Water District wants construction work for the GP3 Replacement Well Implementation Project. The work includes installing a submersible pump, process piping, valves, electrical systems, a standby generator, instrumentation, and related equipment, plus structural and architectural changes at Well Station 3 and roof replacement at Well Stations GP2 and GP3. Full bid documents are on COMMBUYS; submitting a quote requires a free account.
About this opportunity
www.projectdoc.com project ID# 261859. Work includes the installation of the submersible pump, motor, and pitless adapter; installation of process piping, valves, electrical work including installation of a standby generator, instrumentation, and all appurtenances; Well Station 3 architectural and structural modifications; painting, and replacement of the existing roof system at Well stations GP2 and GP3. Point of contact: Robert Bernardo ([email protected]). Solicitation BD-21-2174-SWD50-SWD50-133266 from Seekonk Water District. Full documents and how to quote are on COMMBUYS, the Commonwealth of Massachusetts procurement portal (viewing is public; quoting needs a free…
Time remaining
Closes Oct 8, 2026
Related Opportunities

Bedford Emergency Call Box Services RFQ to Authorized Service Providers

PRF86 Cat III: Y&FS MHAT Media Campaign

Bid for Town owned Building

Food Broadliner Distributor

2027-03 Route 1A Storage Building
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-FB53FA

