Opportunity timeline

PostedSep 9, 2026
DeadlineSep 21, 2026

In plain English

The government wants a contractor to replace the bulkhead crane bus rail system at Captain Anthony Meldahl Locks and Dam. The work includes a new four-bar, 500-amp aluminum system for three-phase, 480V power with ground, about 1,400 feet per bar, eight collector shoes, expansion couplings, and repairs or replacement of about half of the existing covers and supports.

About this opportunity

This requirement is to furnish all labor, equipment, and materials to remove the existing Bulkhead Crane bus rail system and furnish and install a new four-bar, 500-amp aluminum bus rail system consisting of three-phase, 480V power with ground, approximately 1,400 feet per bar, including associated hardware, eight (8) new collector shoes, and electrical expansion couplings. Repair or replace approximately 50 percent of the existing protective bus rail covers, supports, and associated hardware, and modify existing covers as necessary to provide complete coverage of the new bus rail system.

Time remaining

Closes Sep 21, 2026

07Days
:
08Hours
:
58Min
:
07Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-B3A83F