Opportunity timeline

PostedSep 8, 2026
DeadlineOct 27, 2026

In plain English

The Northeast Ohio Regional Sewer District is seeking construction services for solids-handling improvements, including a new liquid sludge receiving station, sludge storage tank cleaning and upgrades, piping and vault work, equipment replacements, building renovations, structural repairs, parking improvements, and related work. The project includes four sludge storage tanks, six gravity thickeners, Tunnel 5, and other facilities. The description does not provide a bid deadline, location beyond the sewer district, or eligibility requirements.

About this opportunity

In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: Improvements to the Dissolved Air Flotation Unit Process Installation of a new Liquid Sludge Receiving Station adjacent to the existing Sludge Storage Tanks (SSTs), Replacement of piping, valves, vault demolition, and other appurtenances related to two Easterly Sludge Force Main Vaults, Replacement of the existing Waste Heat Boiler (WHB) dry ash pneumatic conveyance system with slurry system, replacement of existing scrubber drain header, and installation of new backup scrubber drain header. Cleaning of sludge, grit, and debris from four (4) of the…

Time remaining

Closes Oct 27, 2026

43Days
:
12Hours
:
45Min
:
13Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-283D87