In plain English

New Diana ISD wants drainage and erosion work at several campus locations. The project includes reshaping gravel pavement and drainage ditches, installing storm pipe, adding rock riprap, and replacing concrete pavement with a storm sewer inlet and piping. Plans, addenda, and bidding are managed through CivCast.

About this opportunity

The New Diana ISD Drainage and Erosion project consists of regrading and reshaping gravel pavement and drainage ditch at the Ag Barn and a drainage ditch near the northeast corner of the Football Field/Track; installing new storm pipe and reinstalling existing concrete safety end treatments and adding rock rip rap to side slopes east of the Visitor Parking Lot; and removing and replacing concrete pavement and adding a storm sewer inlet and piping at the west side of the Field House. Sourced from CivCast, where plans, addenda, and bidding are managed.

Time remaining

Closes Oct 1, 2026

17Days
:
13Hours
:
45Min
:
24Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-9AE5C6