Opportunity timeline

PostedSep 8, 2026
DeadlineOct 8, 2026

In plain English

Clayton County Water Authority wants a licensed utility contractor to replace an existing sanitary sewer with about 14,453 linear feet of new 36-inch and 30-inch gravity-flow sewer. The work includes reconnecting several smaller existing sewers. Attendance at the mandatory pre-bid meeting is required on September 15, 2026, at 10:30 AM ET in Jonesboro, Georgia.

About this opportunity

The Clayton County Water Authority (CCWA) intends to contract with an experienced licensed utility contractor to complete the Camp Creek Outfall Replacement - Phase 1 Project. The purpose of the Project is to install approximately 14,453 linear feet of new 36-inch and 30-inch gravity-flow sanitary sewer replacing an existing 30-inch gravity-flow sanitary sewer. Multiple reconnections of smaller existing sewers will be required to complete the work. Pre-bid meeting (attendance mandatory): Sep 15, 2026 @ 10:30 AM ET at CCWA General Services Building, 9740 Thomas Rd, Jonesboro. Point of contact: CCWA PROCUREMENT ([email protected]). Event PE-63125-NONST-2027-000000081 on the Georgia…

Time remaining

Closes Oct 8, 2026

24Days
:
14Hours
:
45Min
:
44Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-8DAD37