Opportunity timeline
In plain English
SEPTA wants a stator rewound with Kapton mica insulation for an M4 MJA250-1 Adtranz traction motor. The work includes removing and replacing the stator in its shell, limiting replacement laminations to 7.5 inches per stator, and installing new motor leads and cable components to SEPTA specifications. Quotes must be submitted through SEPTA’s eProcurement System; contact Joel Rosario for questions.
About this opportunity
STATOR RE-WOUND WITH KAPTON MICA INSULATION FOR USE IN M4 MJA250-1 TRACTION MOTOR ADTRANZ PN TK 10061-FTE AS PER M-4 HEAVY REPAIR MANUAL CHAPTER
14. REPLACEMENT LAMINATIONS NOT TO EXCEED 7,5 INCHES PER STATOR. STATOR SHALL BE REMOVED AND REPLACED WITHIN SHELL AND INCLUDE NEW MOTOR LEADS AS PER SEPTA DRAWING NUMBERS B-5101-A. REV A (SPEC S-3625-1) CABLE SET AND A-5094 (SPEC S-5094) CABLE CONNECTOR LUG SEPTA item LCN082126001 (Quotes). Bids and quotes are submitted through SEPTA's eProcurement System (ePS); see the original posting for the full terms. Contact: Joel Rosario, 215-580-3515, [email protected].
Time remaining
Closes Sep 22, 2026
Related Opportunities

Plastic Bags, 13" x 18" Slider Bags

KEN-Charging Station

Service Ribbons

Waste Bag

Underground Storage Tank - Erie VA Medical Center
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-E91FB9


