Opportunity timeline

PostedSep 4, 2026
DeadlineSep 17, 2026

In plain English

The Township of Holmdel wants a contractor to locate and line an existing 6-inch force main using a flexible fiber-reinforced liner. The work includes temporary bypass piping, access pits, needed pipe replacement, air-release valve and fitting replacements, discharge manhole rehabilitation, and pavement and driveway restoration. Work must be completed within 300 calendar days after the notice to proceed.

About this opportunity

The scope of Work contemplated for the abovenamed Project includes the location and lining of an existing 6” force main with a flexible fiber reinforced liner. Specific work will include completion of test pits to locate the existing force main alignment; installation of a temporary bypass system; excavation of access pits; force main lining; force main pipe replacement where necessary; replacement of air release valves, piping and fittings; rehabilitation of the existing discharge manhole; pavement and driveway restoration as noted; and other miscellaneous site improvements; as well as all other Work of any type or description necessary for completion of the Project, whether or not…

Time remaining

Closes Sep 17, 2026

03Days
:
11Hours
:
46Min
:
40Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-3C0162