West Cliff Dr Path Realignment

Opportunity timeline

In plain English
The City of Santa Cruz is seeking improvements at two sites along West Cliff Drive. Work includes realigning and repaving paths, drainage work, fencing, rest areas with benches, vegetation restoration, grading, and related site improvements.
The project includes improvements at two sites to enhance pedestrian access, drainage, site amenities, and overall safety. At Site 1, the proposed improvements include demolition and repaving of a portion of the existing path, removal of deteriorated path segments, construction of a wood split rail fence with gate, and installation of decomposed granite rest areas with benches and memorials. Drainage improvements include construction of a swale and connection of a new catch basin to the existing storm drain system. Additional improvements include installation of a hose bib and box, vegetation restoration with a rock swash, and associated grading. At Site 2, improvements include removal of…
Time remaining
Closes Sep 24, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-045A73