Opportunity timeline
In plain English
The U.S. Forest Service wants one new slide-in water tank unit for a government-owned 2013 Freightliner M2 dump truck. The tank must hold at least 2,600 gallons, fit within the stated size limits, include an engine-powered pump and specified plumbing, and come with securement hardware and support legs. Delivery to Carson, Washington, must be completed within 60 calendar days; vendors must submit a firm-fixed-price quote, compliance checklist, layout drawing, and delivery schedule.
About this opportunity
Unit: EA CLIN 0002: Shipping and Handling: FOB Destination to Carson, WA 98610. (Note: Shipping costs will be evaluated but only executed if the successful contractor's facility is located outside the 100-mile local government pickup radius). 3. Core Technical Salient Characteristics Summary The manufactured water tank system must conform strictly to the mechanical and physical boundaries of the government's host vehicle (2013 Freightliner M2, 4-Axle Dump Truck equipped with a drop axle). Physical Footprint Box Constraints: Main Tank Truck Box Clearance: Main tank structure must drop cleanly into the truck bed box dimensions (180”L × 72”W × 54”H). Ultimate System Maximum Footprint: Total…
Time remaining
Closes Sep 16, 2026
Related Opportunities

GOLAN 45 AMMUNITION STORAGE VESSEL Camp Humphreys, South Korea

Skid-mounted Airfield Liquid De-icing System

Repair of Water Storage Tank Leaking Seams at the Northampton VA Medical Center

Gas Cylinders

Tank,pressure
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-A12B5C

