Opportunity timeline

PostedSep 4, 2026
DeadlineSep 21, 2026

In plain English

The City of Lowry Crossing wants a contractor to rehabilitate Bridgefarmer Road from Highridge Farms to Dowdy Road. Work includes reshaping the existing pavement and base, removing 6 inches of material, building a 12-inch cement-stabilized subgrade, and installing Type D surface and Type B base courses.

About this opportunity

Scope: Furnishing all necessary materials, machinery, equipment, superintendence, and labor for the Bridgefarmer Road Rehabilitation (Phase 3 - Highridge Farms To Dowdy Road) for the City of Lowry Crossing. The project includes scarifying, mixing, and reshaping the pavement surface and base material, removal of the top 6-inches of scarified asphalt and base, constructing a minimum 12-inches cement stabilized subgrade, and 1.5-inch Type D surface course over 4.5-inches Type B base course, along with all appurtenances. Sourced from CivCast, where plans, addenda, and bidding are managed.

Time remaining

Closes Sep 21, 2026

07Days
:
15Hours
:
49Min
:
17Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-82F6CD