Opportunity timeline

PostedSep 4, 2026
DeadlineDec 3, 2026

In plain English

The Department of Defense wants a contractor to repair, test, inspect, and return variable generators to ready-for-issue condition. The required repair turnaround time is 118 days after receipt, with asset induction ending 365 days after award. Contractors must provide the labor, parts, facilities, tooling, and test equipment; early and incremental deliveries are preferred.

About this opportunity

This requirement is for the repair of the items herein thissolicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual…

Time remaining

Closes Dec 3, 2026

80Days
:
12Hours
:
44Min
:
32Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-BDEFD5