Opportunity timeline
In plain English
The Navy wants a contractor to repair, overhaul, upgrade, test, and inspect aircraft fan blade sets and return them to ready-for-issue condition. Contractors must provide the facility, labor, materials, replacement parts, tooling, and testing equipment; the required repair turnaround time is 90 days after receiving each asset. No quantity, location, or submission deadline is provided.
About this opportunity
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and…
Time remaining
Closes Oct 5, 2026
Related Opportunities

NSN 2840-01-308-4467NZ, P/N 4070107, Liner, Augmentor COM, FD2030-26-01584

Case, Turbine, Aircra.

NSN: 2840-00-411-8852 OJ P/N: 6870409 Noun: Support,turbine COM

Valve,press Reducin

Valve,relief,fuel
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-766217

