Opportunity timeline

PostedSep 3, 2026
DeadlineSep 17, 2026

In plain English

The Town of Arlington wants restoration of about 12 linear feet of fieldstone retaining wall over the Herbert Meyer Brook culvert, plus replacement of the adjacent asphalt sidewalk. The scope statement will be available for download from ArlingtonMa.gov/purchasing starting September 3, 2026. Full documents and quoting instructions are on COMMBUYS; a free sign-in is required to submit a quote.

About this opportunity

26-45 Mystic Street Retaining Wall Restoration. Scope of Work Statement is available via electronic download from ArlingtonMa.gov/purchasing beginning 9/3/26. Work consists of restoration of approximately 12 lf of fieldstone retaining wall over the Herbert Meyer Brook culvert and replacement of adjacent asphalt sidewalk. Point of contact: Mary Ellen DeNatale ([email protected]). Solicitation BD-27-1241-ARL03-ARL03-132970 from Town of Arlington. Full documents and how to quote are on COMMBUYS, the Commonwealth of Massachusetts procurement portal (viewing is public; quoting needs a free COMMBUYS sign-in).

Time remaining

Closes Sep 17, 2026

03Days
:
15Hours
:
40Min
:
40Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-B56B1E