Opportunity timeline
In plain English
Clark Construction is seeking bids for mechanical installation of the material handling system in Cargo Building 626.1 at San Francisco International Airport. The project includes a two-story cargo building with 28 truck docks, seven future docks, and structural provisions for material handling equipment. Bids are due September 18, 2026, at 2:00 p.m., and the package has a 5% local business enterprise participation requirement.
About this opportunity
Design-Builder Firm Name: Clark Construction Project Overview: The Airport has a series of cargo buildings at the end of their useful life. The scope of this project is a core-and-shell 2-story cargo building with associated leasable office space mezzanine and improved sidewalk and landscaping elements. All interior fit-out work to be by future tenant. Phase 1 (626.1) Scope includes cargo warehouse space spread across two floors, 28 truck docks, 7 future truck docks, structural accommodations for material handling systems such as an elevating transfer vehicle (ETV), office space with light wells and two parking stalls, both of which are handicap accessible. The ware house facade is…
Time remaining
Closes Sep 18, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-8EFC35


