Opportunity timeline
In plain English
The San Francisco Airport wants a Project Delivery Partner to support and manage delivery of a design-build modernization project at the Dianne Feinstein International Terminal. Work includes separating HVAC controls from smoke control, integrating smoke control with the fire alarm system, replacing outdated components, and upgrading the system to current building codes.
About this opportunity
This procurement is to award a Project Delivery Partner (PDP) contract to provide a full range of project support and delivery services for The Dianne Feinstein International Terminal Smoke Control and Fire Alarm Modernization Project (Project). This design-build Project will separate the heating, ventilation and air conditioning (HVAC) controls from the smoke control functions; integrate those smoke control functions into the fire alarm system; replace components that are at the end of their useful life; and upgrade the system to current building codes. Posted by San Francisco Airport (Construction) on OpenGov Procurement. Sourced from OpenGov Procurement, where plans, addenda, and Q&A are…
Time remaining
Closes Oct 3, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-BEB3CE


