Opportunity timeline

PostedSep 3, 2026
DeadlineSep 24, 2026

In plain English

The government wants a contractor to remove, store, inspect, and reinstall navigational buoys, channel markers, dock floats, ramps, and a dock. The work covers several anchorages, coves, Brockway Island, and town docks. Winter removal must start on or after November 15, 2026, and finish by November 30, 2026; repairs are reported with estimated costs but are not included in this bid.

About this opportunity

The bid is to remove, store, inspect and provide a report with needed repairs and cost to repair (cost to repair not included in bid) and install in proper location in the Spring. Navigational Aids: Anchorage buoys — 10 buoys from Main Anchorage (A – K, excluding C), 2 buoys from Meadows Anchorage (A & B) and 1 Rock buoy located northwest of Brockway, and one No Wake buoy at the southern entrance to North Cove. Channel markers — 11 in North Cove. Install two buoys at the entrance to South Cove. Floats — Town Dock at Main Street, Mack Lane and Town Park (ramps for Mack Lane and Town Park to be stored with floats). The Mack Lane dock to be removed for the winter. Rock markers: • Remove the…

Time remaining

Closes Sep 24, 2026

10Days
:
16Hours
:
46Min
:
51Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-96EA89