Opportunity timeline
In plain English
The FBI needs six UH-60M instrument panel modifications. The work includes designing, manufacturing, installing, and delivering replacements for Garmin GPS-500 units with Garmin GTN-625Xi units for its Tactical Helicopter Unit. Questions are due by September 9, 2026, at 10:00 a.m. CST.
About this opportunity
The FBI requires the design, manufacture, install deliver and install six (6) UH-60M instrument panel modifications to replace the currently installed Garmin GPS-500s with Garmin GTN-625Xi units in support of the FBI’s CIRG Tactical Helicopter Unit (THU). This requirement meets recurring mission-critical needs for the FBI. Questions and Requests for Clarification Questions regarding this solicitation shall be submitted on Attachment 4 via email to Maureen Murdock at [email protected] and Andrea Dailey at [email protected] no later than 9 Sept 2026 at 10:00am CST Questions received after the established deadline may not be answered. Responses to questions will be provided through solicitation…
Time remaining
Closes Sep 16, 2026
Related Opportunities

Resistor, VA, NONWI

SPRRA1-26-R-A013

MH-65 Backing Brake Plate

Production of C-130 Peculiar Support Equipment

Elbow, Tube
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-F027C4

