Opportunity timeline
In plain English
The County of Orange is seeking contractors for design, permitting, and construction of the Zone 4 Phase A landfill gas collection and control system header. Work includes trenching, new HDPE piping, valves, tie-ins, testing, backfilling, and site restoration, with coordination around landfill operations and traffic control. This is a pre-qualification opportunity; the provided text does not include quantities or key dates.
About this opportunity
The project consists of design, permitting, and construction of the Zone 4 Phase A Landfill Gas (LFG) Collection and Control System (LFGCCS) header installation. Work to include trenching, installation of new HDPE header piping, associated valves and appurtenances, tie-ins to existing LFG infrastructure, backfilling, testing, and restoration of disturbed areas. Contractors should account for site constraints including traffic control, construction sequence, coordination with landfill operations, subcontractor scheduling, and materials procurement. Completed work will provide the owner with improvements to the LFGCCS, including the fully installed Zone 4 Phase A header and associated…
Time remaining
Closes Sep 18, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-925C31

