Opportunity timeline

PostedSep 2, 2026
DeadlineNov 16, 2026

In plain English

The U.S. Army Corps of Engineers plans to build a new 1,200-foot lock at Lock and Dam 25, including drilled-shaft foundations, a 1,200-foot upstream guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain and later serve mainly recreation traffic or as a backup. Plans and the Navisworks model must be requested from the contract specialist by email; Amendment 0001 includes updates through August 31, 2026.

About this opportunity

NESP LD25 1200 ft Lock --------- The new lock at Lock 25 will be constructed in the downstream direction in the auxiliary miter gate bay, which has minimum provisions for an adjacent 360-foot-long lock and is referred to as Location 3 in the System Feasibility Study (September 2004). This contract will consist of construction of a new 1,200-foot drilled shaft-founded lock in the auxiliary miter gate bay, a 1,200-foot upstream ported guard wall, and a 650-foot downstream guard wall. The existing 600-foot lock will remain in place and once the new lock is constructed and operational, will become an auxiliary lock chamber used primarily by recreation traffic or when the 1,200 ft lock is out of…

Time remaining

Closes Nov 16, 2026

63Days
:
06Hours
:
01Min
:
19Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-100AE3