Opportunity timeline
In plain English
San Francisco Public Works wants to replace the switchboards, UPS 2, transformer, and HVAC systems at 1011 Turk Street. The work includes temporary power, shutdown and cutover coordination, testing, and commissioning, with 600 calendar days allowed and an estimated cost of about $7.8 million. A Class B license is required, and the on-site pre-bid meeting and site walk are scheduled for September 15, 2026, at 1:00 p.m. in San Francisco.
About this opportunity
1011 Turk Street Switchboard, UPS2, and HVAC Replacement Scope of Work: The project includes three major scopes of work as summarized herein: 1. Replacement of the existing low-voltage switchboards serving the facility, including associated feeder modifications, terminations testing, and commissioning. The work also includes temporary power provisions, phased shutdown sequencing, and cutover coordination to maintain facility operations during construction. 2. Like-for-like replacement of Uninterrupted Power System (UPS) 2, relocation of a new like-for-like low voltage transformer replacement, and electrical connections to new mechanical equipment.
Time remaining
Closes Oct 14, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-FED141


