Opportunity timeline
In plain English
The Fenske Road Municipal Utility District is seeking a lump-sum contractor to build its water plant. The work includes an 83,440-gallon ground storage tank, pump and control systems, hydropneumatic tank, treatment equipment, a 130 kW diesel generator, foundations, grading, paving, piping, electrical work, and related construction shown in the plans and specifications.
About this opportunity
Construction of the Fenske Road MUD Water Plant to include one 83,440 gallon bolted steel ground storage tank, operations/booster pump building, well control panel, three 25 horsepower 400 gpm end suction centrifugal booster pumps and control panel, one 5,073 gallon ASME code hydropneumatic tank, sodium hypochlorite equipment, expected liquid phosphate equipment 130 kW diesel generator, concrete foundations, site grading, site paving, yard piping, electrical, and all else as shown on the construction drawings and detailed in the specifications for a fully functioning facility for a lump sum bid. Sourced from CivCast, where plans, addenda, and bidding are managed.
Time remaining
Closes Oct 1, 2026
Related Opportunities

New MAB FMS Equipment Shed

Cardio-Pulmonary Booms

Certification of Sterile Compounding Facilities Services

1st Qtr. Bread FY27 - FDC Houston

1ST QTR FY27- Milk - FDC Houston
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-E08FB5

