Opportunity timeline

PostedSep 2, 2026
DeadlineSep 25, 2026

In plain English

The Navy wants to repair, test, inspect, and return five Maintenance Control units (NIIN 016010281, part number 3995AS2400-1) to ready-for-issue condition. The required repair turnaround time is 125 days after receipt, and government source approval is required before award. Quotes were to be emailed to [email protected]; the solicitation is being closed early on September 2, 2026, because a quote was received and the requirement was designated sole source.

About this opportunity

The purpose of this amendment is to close the solicitation early on 09/02/2026 due to receipt of quote and sole source designation.

Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action…

Time remaining

Closes Sep 25, 2026

11Days
:
16Hours
:
14Min
:
49Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-EB64BC