Opportunity timeline

PostedSep 2, 2026
DeadlineSep 30, 2026

In plain English

The Town of Lincoln Water Department wants a qualified contractor to install one Hyper-Heat Pump system with floor- and wall-mounted A/C evaporators and one Energy Recovery Ventilator sized for four people. The work also includes removing or replacing existing ductwork, cleaning or replacing accessible ducts, sealing seams, and adding R-8 insulation. Solicitation BD-27-1800-TOLWD-TOLWD-132943 is posted on COMMBUYS; quoting requires a free sign-in.

About this opportunity

The Town of Lincoln Water Department is soliciting sealed bids from qualified contractors for the installation of one (1) Hyper-Heat Pump system, with floor and wall-mounted A/C evaporators, as well as (1) Energy Recovery Ventilator unit sized for 4 people. In addition, all existing duct work will be removed and/or replaced as necessary. All accessible ducts will be cleaned or replaced as needed, all seams will be sealed and R-8 insulation applied. Point of contact: Daniel Pereira ([email protected]). Solicitation BD-27-1800-TOLWD-TOLWD-132943 from Town of Lincoln. Full documents and how to quote are on COMMBUYS, the Commonwealth of Massachusetts procurement portal (viewing is…

Time remaining

Closes Sep 30, 2026

16Days
:
11Hours
:
45Min
:
15Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-5D4A3E