In plain English

Sacramento County wants a qualified tank contractor to design and build a new 350,000-gallon prestressed concrete drinking-water tank at the Rio Consumnes Correctional Center. The work includes site preparation, a gravel access road, water lines, conduit, and permit-ready engineering documents. The project is inside a secure correctional facility, so background checks are required for people attending the mandatory pre-bid meeting and entering the site; bidders must also meet the attached technical specifications and submit the required bid documents.

About this opportunity

The County of Sacramento ("County") is soliciting Bids from a qualified Tank Contractor ("Contractor") to provide design and construction services to construct a new 350,000 gallon potable water prestressed concrete tank at the Rio Consumnes Correctional Center ("RCCC"). The Contractor will complete site preparation and construction of a gravel access road surrounding the proposed tank. The Contractor will also install the proposed water lines and conduit to connect the tank to the existing water treatment facility. The Contractor will be required to submit design drawings and calculations for the proposed tank and foundation suitable for obtaining building permits sealed by an Engineer…

Time remaining

Closes Oct 8, 2026

24Days
:
13Hours
:
55Min
:
19Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-45E233