In plain English

The project will improve Seymour No. 4 Dam by replacing the spillway, adding 48-inch and 16-inch outlet piping, installing a slide gate and low-level outlet valve, repairing and raising the crest, placing riprap, and building a 100-foot auxiliary spillway. Work also includes tree and stump clearing, slope repairs, and reseeding. The solicitation number is DEEP090126CM; full bid details are on CTsource.

About this opportunity

Replace the existing spillway with a concrete drop inlet strucure with 48-inch discharge pipe and energy dissipator at the downstream end. A new 16-inch outlet pipe controlled by a stainless steel slide gate will be installed in the drop inlet spillway structure. Installation of a new valve and extension stem on the existing low level outlet upstream of the dam at the bottom of the reservoir. Trees will be cleared from the embankments and the downstream slope will be filled in the vicinity of the new spillway discharge pipe and energy dissipator. Eroded areas on the crest will be repaired, the crest will be raised one foot. Riprap will be placed on the upstream slope. Construction of a…

Time remaining

Closes Oct 6, 2026

22Days
:
10Hours
:
44Min
:
08Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-EF30E4