Opportunity timeline

PostedSep 1, 2026
DeadlineSep 22, 2026

In plain English

The City of Cedar Hill wants to rehabilitate equipment at the Meadow Crest Pump Station. Work includes replacing gas detection, valves, piping, a vertical turbine pump, electrical disconnect equipment, and related pump and transfer-switch rehabilitation. Bids and project documents are managed through CivCast.

About this opportunity

The work under this contract includes furnishing all labor, tools, material, and equipment, and for performing all work necessary for rehabilitation of equipment at Meadow Crest Pump Station specified in Bidding Documents. The work generally includes the materials and labor to replace a gas detector; replace four 12” gate valves, install two 18” gate valves, and piping and appurtenances; rehabilitate an automatic transfer switch; replace a vertical turbine pump; rehabilitation of a pump motor; replace electrical disconnect equipment; and relocate disconnect panels. All of the above shall be done in accordance with NCTCOG specifications, with the City of Cedar Hill’s Addenda and as per…

Time remaining

Closes Sep 22, 2026

08Days
:
13Hours
:
45Min
:
31Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-FA22DF