Opportunity timeline

PostedSep 1, 2026
DeadlineOct 1, 2026

In plain English

The Navy wants a contractor to repair, upgrade, test, and inspect one shaft assembly identified by NSN 3040-016711418 and part number 06371-03801-101. The contractor must provide the labor, materials, parts, tooling, and equipment needed to return it to ready-for-issue condition. The initial induction period is 365 days, with a possible extension to two years; quotes must include turnaround time and pricing for up to one unit.

About this opportunity

This RFQ is for repair requirement. Repair Turnaround Time (RTAT): the resultant contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor?s facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must…

Time remaining

Closes Oct 1, 2026

17Days
:
11Hours
:
28Min
:
25Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-E66098