Opportunity timeline
In plain English
The Navy wants a contractor to repair, test, inspect, and return an aircraft actuator-variable component. Repairs must be accepted within 7 days after receipt, with a 365-day window for sending in assets; the contractor must state its monthly repair capacity. Quality controls, testing, inspection records, and MIL-STD-130 markings are required.
About this opportunity
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and…
Time remaining
Closes Oct 1, 2026
Related Opportunities

Resistor, VA, NONWI

SPRRA1-26-R-A013

MH-65 Backing Brake Plate

Production of C-130 Peculiar Support Equipment

Elbow, Tube
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-CDDE2B

