Opportunity timeline
In plain English
The U.S. Navy wants 36 power supplies repaired, tested, inspected, and returned to ready-for-issue condition. The required repair turnaround time is 425 days after receipt, with asset induction ending 365 days after contract award. Government source approval is required before award; unapproved sources must submit the information required in the NAVSUP WSS Source Approval Brochure. Quotes must be emailed to the listed Navy contact by the due date on page 1, block 10.
About this opportunity
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and…
Time remaining
Closes Sep 28, 2026
Related Opportunities

UNITROL 6800-Exciter HMI & Firmware Upgrade

Distributing System

30 CES Pad-Mount Transformers

Distribution BOX

6150-Cable Assembly, Power, Electrical, Virginia Class Submarine
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-E59AF3

