Opportunity timeline
In plain English
The Rose Bowl Operating Company is seeking a construction manager at risk for preconstruction and design-assist work, including subsurface field investigations, for the Rose Bowl Stadium Plumbing Maintenance Project. The work covers replacement and rehabilitation of water, sewer, and gas systems beneath the stadium concourse while events continue and fire protection service remains operational. The project has a base water package plus separately priced sewer and gas alternates; construction is a possible second phase that RBOC is not required to authorize. Up to five finalists may be shortlisted for interviews, with award based on best value and relevant wet-utility, occupied-venue, safety, financial, and local-workforce experience.
About this opportunity
The Rose Bowl Operating Company (“RBOC”) is seeking statements of qualifications, technical proposals, and price proposals (“Proposal(s)”) for a Construction Manager at Risk (“CMAR” or “Contractor”) to provide preconstruction/design-assist services including a funded subsurface field investigation program and, if RBOC's option to authorize Phase 2 is exercised, construction services for the Rose Bowl Stadium Plumbing Maintenance Project (the “Project”): the replacement and rehabilitation of the stadium's water, sewer, and gas distribution systems beneath the stadium concourse, implementing the replacement program recommended by the Rose Bowl Sewer and Water Asset Management Plan (2022), as…
Time remaining
Closes Sep 17, 2026
Related Opportunities

BULK OXYGEN (Base+4 Option)

USNS Alan Shepard - Chill Water Valve

Seat ASM - Driver's, Recaro ERGO METRO AM384

Door ASM - Access, Defroster

Filter - Driver's Heater/defroster, Fresh Air (BUSES 5600-5850 Only)
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-BC8981


