In plain English

New Braunfels Utilities is seeking qualified firms for construction services to replace about 2,730 linear feet of 4-inch, 6-inch, and 12-inch water mains in the Solms area near IH 35. Work includes a pressure reducing valve, pipe abandonment and removal including asbestos cement pipe, traffic control, stormwater protection, and site restoration. Plans, addenda, and questions are managed through OpenGov Procurement.

About this opportunity

New Braunfels Utilities (“NBU”) invites the submittal of responses to this Request for Proposals (“RFP”) from qualified firms interested in providing construction services in connection with the construction of AC Pipe Replacement Solms (IH 35) (the “Project”). The Project has been designed by Quiddity Engineering, LLC. The Project includes the following items within its scope: (i) construction of approximately 2,730 linear feet (“LF”) of 4-inch, 6-inch, and 12-inch water main piping by open cut; (ii) pressure reducing valve (“PRV”); (iii) grout fill abandonment of existing piping; (iv) removal of existing piping (including removal of asbestos cement pipe); (v) traffic control; (vi) storm…

Time remaining

Closes Sep 18, 2026

04Days
:
12Hours
:
41Min
:
47Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-2806A1