Opportunity timeline

PostedAug 26, 2026
DeadlineSep 24, 2026

In plain English

The City of Santa Cruz wants a contractor to improve unsignalized pedestrian crossings. Work includes concrete curbs, gutters, sidewalks and curb ramps, plus signs, pedestrian-activated beacons, striping, and pavement markings. The project also includes related work required by the plans and specifications.

About this opportunity

The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Installing concrete curbs, gutters, sidewalk, curb ramps, roadway signs, pedestrian activated beacons and striping and pavement markings. All other work not mentioned above that is required by the plans, City Standard Specifications, State Standard Specifications and the Special Provisions shall be performed, placed, constructed or installed. Posted by City of Santa Cruz on OpenGov Procurement. Sourced from OpenGov Procurement, where plans, addenda, and Q&A are managed.

Time remaining

Closes Sep 24, 2026

10Days
:
12Hours
:
41Min
:
39Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-C2E7F7