HSIP Cycle 11 & 12: Unsignalized Crossing Improvement Project

Opportunity timeline

In plain English
The City of Santa Cruz wants a contractor to improve unsignalized pedestrian crossings. Work includes concrete curbs, gutters, sidewalks and curb ramps, plus signs, pedestrian-activated beacons, striping, and pavement markings. The project also includes related work required by the plans and specifications.
The Project to be performed consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to, the following: Installing concrete curbs, gutters, sidewalk, curb ramps, roadway signs, pedestrian activated beacons and striping and pavement markings. All other work not mentioned above that is required by the plans, City Standard Specifications, State Standard Specifications and the Special Provisions shall be performed, placed, constructed or installed. Posted by City of Santa Cruz on OpenGov Procurement. Sourced from OpenGov Procurement, where plans, addenda, and Q&A are managed.
Time remaining
Closes Sep 24, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-C2E7F7