Opportunity timeline

PostedAug 28, 2026
DeadlineSep 18, 2026

In plain English

The government wants a contractor to replace the Navigation Lock 1 bridge at Bonneville Lock and Dam with a new single-span steel girder bridge, concrete deck, abutments, and approach roads. The work also includes partial demolition of the existing bridge, lead and asbestos removal, phased construction to keep critical vehicle access open, and barge crane work near a high-voltage power line. An amendment adds a government-furnished power line layout for contractor information; field verification is required.

About this opportunity

*** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file “Power Line Layout” is provided for the Contractor’s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on…

Time remaining

Closes Sep 18, 2026

04Days
:
13Hours
:
59Min
:
51Sec

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-7B8FEC