Opportunity timeline

PostedAug 28, 2026
DeadlineSep 21, 2026

In plain English

NRCS Washington wants repairs to the Kalispel Tribe dike in Pend Oreille County, Washington. Work includes dewatering, erosion control, excavation, culvert and anti-seep collar removal or replacement, riprap and geotextile installation, and dike backfilling and compaction. The site visit is September 10, 2026, at 10:00 a.m. PT, and quotes are due September 21, 2026, by 2:00 p.m. PT. The estimated project size is $250,000 to $500,000.

About this opportunity

NRCS Washington is soliciting proposals to repair the Kalispel Tribe Dike located in Pend Oreille County, Washington. This project consists of dewatering the site, providing erosion control, excavating the existing dike soil and stockpiling, removing the 36" diameter dike culvert and anti-seep collars, if in suitable condition, as determined by the COR, resetting the existing dike culvert and anti-seep collars, placing riprap and nonwoven geotextile around the culvert outlet, backfilling and compacting the dike. If the existing 36" diameter dike culvert and anti-seep collars are not salvageable, then a new 36" diameter culvert and anti-seep collars will be installed as specified. SITE…

Time remaining

Closes Sep 21, 2026

07Days
:
18Hours
:
42Min
:
22Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-60306C