Opportunity timeline
In plain English
Paulding County wants to rebuild the Seven Hills Boulevard and Naturewalk Parkway/Fieldstone Lane intersection as a single-lane roundabout. The bid is posted on Georgia’s public procurement registry; full documents and response instructions are available there. Tara Goldin is the point of contact.
About this opportunity
Reconstruct the existing intersection between Seven Hills Boulevard and Naturewalk parkway/ Fieldstone Lane. The intersection is currently a four way with the side streets under stop control. The project will convert the intersection into a single lane roundabout Point of contact: Tara Goldin ([email protected]). Event PE-77892-NONST-2027-000000089 on the Georgia Procurement Registry (GPR), Georgia's statewide bid posting site. Full documents and how to respond are on the posting — viewing is public.
Time remaining
Closes Sep 25, 2026
Related Opportunities

Refrigeration Service for LDC at Fort Stewart, GA

Facility Assessment

Facility Condition Assessment

Fire Alarm Maintenance and Inspection

Bid No. 27003-2001, Union Park Pavilion Phase II
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-43D3BC

