Opportunity timeline

PostedAug 28, 2026
DeadlineOct 7, 2026

In plain English

Harris County Municipal Utility District No. 200 wants a replacement 1.44 million-gallon-per-day wastewater treatment plant. The work includes treatment equipment, pump stations, buildings, electrical and controls, ponds, grading, paving, piping, demolition, and related site work. Plans, addenda, and bidding are managed through CivCast.

About this opportunity

The work consists of providing the necessary labor, materials, equipment, supervision, and plant to construct the

1.44 MGD Wastewater Treatment Plant Replacement work including but not limited to: headworks improvements; sequencing batch reactors; clarified effluent pump station; aeration blowers; disinfection basin; aerobic digesters; digester blowers; NPW pump station; chemical building; electrical buildings; generator; electrical service; detention and mitigation ponds; site grading and drainage structures; concrete paving; piping, manholes, and inlets; protective coatings; electrical; controls; clearing and grubbing; fencing; hydro-mulch seeding; duct bank and pull boxes; demolition…

Time remaining

Closes Oct 7, 2026

23Days
:
10Hours
:
38Min
:
01Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-87E3EB