Mexichem Fluor Inc. expects to request quotes for about two equipment packages to load HCL and unload PCL3 from rail cars at a planned lithium hexafluorophosphate plant in Louisiana. The packages must handle vapors and include safety instrumentation, with stainless steel and high-nickel alloys expected. The RFQ is expected around September 25, 2026; bidders must sign a nondisclosure agreement and be registered in good standing with SAM.gov before receiving bid documents.

About this opportunity

Mexichem Fluor Inc. (MFI) is working under Department of Energy Grant DE-MS0000009 to design, engineer, plan and build a Lithium hexafluorophosphate (LiPF6) plant in Louisiana, United States of America. MFI intends to issue a request for quotation (RFQ) for approximately two (2) equipment packages required for the loading of HCL and the unloading of PCL3 from rail cars. These packages shall include the capability to handle vapors as needed to ensure personnel safety. Associated safety instrumentation is also included. Material selected to be confirmed based on industry practices; however, materials of construction are expected to be stainless steel and high nickel-based alloy. RFQ is…

Time remaining

Closes Sep 25, 2026

11Days
:
10Hours
:
02Min
:
03Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-6EBCA9