Opportunity timeline

PostedAug 28, 2026
DeadlineSep 15, 2026

In plain English

The district is seeking a contractor to convert Chloramine systems and tie surface water into Water Plants Nos. 1 and 2. Work includes piping, tank tie-ins, chemical and chlorine feed equipment, electrical and control upgrades, building construction, site restoration, and related improvements. The description is cut off before all project details are provided.

About this opportunity

The work for WP No. 1 includes, but is not limited to, the construction of plant piping, valves, fittings, and appurtenances; ground storage tank (GST) tie-in modifications to existing GST; Overflow weir demolition and replacement; CMU building including foundation; LAS chemical feed equipment including pumps, tank, injection quills, and accessories; Chlorine feed equipment and accessories; new electrical equipment; MCC modifications; Autosensory Panel Modifications; transformer and panelboard addition; autodialer modifications; conduit; wiring; ductbank; new building power and lighting; instruments and controls; protective coatings; site work and restoration; fence modifications; and all…

Time remaining

Closes Sep 15, 2026

01Days
:
06Hours
:
58Min
:
50Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-4C21AD