Irene B. Thomas Park Inclusive Playground Renovation

Opportunity timeline

In plain English
The City of Hinesville wants a qualified firm to design and replace the playground at Irene B. Thomas Park in Hinesville, Georgia. The work includes demolition, site preparation, inclusive equipment for children ages 2–12, shade, accessible safety surfacing, installation, and closeout. The maximum contract amount is $350,000, and attendance at the mandatory pre-bid meeting on September 15, 2026, at 2:00 p.m. ET is required.
The City of Hinesville, Georgia, is requesting competitive sealed proposals from qualified firms for RFP 2026-07, Irene B. Thomas Park Inclusive Playground Renovation. The project consists of the turnkey design and replacement of the existing playground, including demolition, site preparation, inclusive playground equipment, an integrated shade solution, accessible safety surfacing, installation and project closeout. The City seeks an integrated, inclusive playground serving children ages 2 through 12 and caregivers of varied abilities. The City seeks a distinctive, high-quality design that will establish the renovated playground as a signature inclusive playground and community destination…
Time remaining
Closes Sep 25, 2026





Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-99EF80