Opportunity timeline

PostedAug 27, 2026
DeadlineSep 16, 2026

In plain English

The City of Richmond wants a contractor to expand the Morton Street parking lot in Phase II. Work includes concrete paving, curbs, ADA ramps, sidewalks, two street tie-ins, a curb wall, stormwater controls, light poles, signage, and pavement markings. Plans and bidding materials are managed through CivCast.

About this opportunity

Major items of work include: 1.) Construction of 5-inch and 6-inch concrete paving, curbs, ADA ramps and concrete sidewalk 2.) Two street tie-ins 3.) Construction of non-structural curb wall 4.) Installation of SWPPP items 5.) Installation of light poles 6.) Installation of signage and pavement markings Posted by Odyssey Engineering Group on behalf of City of Richmond. Sourced from CivCast, where plans, addenda, and bidding are managed.

Time remaining

Closes Sep 16, 2026

02Days
:
10Hours
:
09Min
:
46Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-19EA00