Opportunity timeline
In plain English
The Navy wants a contractor to repair, upgrade, test, inspect, and return Time Distribution S units to ready-for-issue condition. Work must follow Brandywine Communications drawing 025000001 and applicable repair documents, with a required 180-day repair turnaround after receipt. The contractor must provide the facility, labor, parts, tooling, and test equipment; no quantity or bid deadline is provided.
About this opportunity
Repair Turnaround Time (RTAT) definition: The contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor's facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of physical receipt. The Contractor must obtain final inspection and…
Time remaining
Closes Sep 25, 2026
Related Opportunities
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-E664FC


