Opportunity timeline
In plain English
The U.S. Navy wants a contractor to repair Refuel Control Panels under Basic Ordering Agreement N00383-25-G-AQ01. Repairs must be completed, inspected, and accepted within 50 days after the item arrives at the contractor’s facility. Contractors must maintain an approved quality-control system and provide their own repair, testing, inspection, and manufacturing aids.
About this opportunity
This solicitation is for the repair of the items identified herein. These items are covered against Basic Ordering Agreement (BOA) N00383-25-G-AQ01: Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after…
Time remaining
Closes Oct 26, 2026
Related Opportunities

Resistor, VA, NONWI

SPRRA1-26-R-A013

MH-65 Backing Brake Plate

Production of C-130 Peculiar Support Equipment

Elbow, Tube
Bid details are gathered and summarized automatically. Please verify details at the original source.
Ref No.
BS-41BA21

