Opportunity timeline

PostedAug 26, 2026
DeadlineSep 28, 2026

In plain English

The Department of Defense wants 8 control panels for aircraft, identified by NSN 7R-1680-015487128-VA. Delivery is FOB origin. The part requires engineering source approval, so new suppliers must qualify through the design control activity and receive government engineering approval.

About this opportunity

NSN 7R-1680-015487128-VA, TDP VER 001, QTY 8 EA, DELIVERY FOB ORIGIN. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights,manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures,…

Time remaining

Closes Sep 28, 2026

14Days
:
00Hours
:
47Min
:
56Sec

Related Opportunities

Bid details are gathered and summarized automatically. Please verify details at the original source.

Ref No.

BS-547E28